Gateway Mining has dramatically ramped up the drilling firepower at the company’s vast Yandal gold project in Western Australia, securing a third diamond rig to round out an impressive six-rig fleet as it looks to tackle a suite of high-grade gold discoveries across the vast tenure.

The company says the expanded drilling capacity also includes two reverse circulation (RC) rigs and an air-core rig, designed to accelerate discovery and resource growth initiatives, backed by a $ 52.8 million war chest.

The ramp-up is a timely win for Gateway, especially as drill rigs and experienced crews are in tight supply across WA. By locking in additional…

Read the full article at SMH.COM.AU